Blog

DC7157 2

NEMA At Every Stop

Maria Milone, Marketing Manager
Monday Mar 27th, 2017

This is a NEMA type enclosure manufactured to operate in various locations throughout a metropolitan rail system. The enclosure had to be designed to accommodate a specialized, solid state air conditioning unit with a customer specified condensate drainage system. 

PON Box 2

Profile: The Secure PON Enclosure

Maria Milone, Marketing Manager
Monday Mar 27th, 2017

Multiple IPS safes that housed classified equipment were deployed on an American military base; however, to create a proper networking infrastructure, holes would have to be drilled in the safe to accommodate conduit. Drilling holes would compromise the security and integrity of the safe. 

IMG 1056

Profile: The NEMA Type 3R Enclosure

Maria Milone, Marketing Manager
Friday Mar 24th, 2017

A full-scale on site water testing lab has allowed us to create a number of NEMA 3R enclosures, including this box, engineered at the request of a government agency operating in a coastal territory.

containment thumbnail

Data Center Optimization Initiative

Jason Hallenbeck, Data Center Consultant
Wednesday Mar 22nd, 2017

As of August 1, 2016, the Federal Data Center Consolidation Initiative (FDCCI) is superseded by the Data Center Optimization Initiative (DCOI). By Executive Order 13693, all agencies are required to install and monitor advanced energy meters in data centers.